Total Workers Monitored
247
Across 2 sites Β· 231 online
High Risk Workers
18
Needs immediate action
β 3 this week
Watch Zone
54
Monitoring closely
APD Compliance
87%
Target: 95%
β 4% vs last month
π Risk Trend β 12 Months
All Sites
π Noise Exposure Distribution
Pabrik Semarang
β‘ Live IoT Feed β Top Risk Workers
See All on Map β
Critical
3
High Risk
15
Safe
192
Offline
16
πΊοΈ Live Worker Map β Semarang Factory Site
π’ Live
WORKER STATUS
Safe
Watch
High Risk
Critical
Offline
π‘ Real-time IoT Snapshot
π‘οΈ Avg Vitals β Last 15 min
Workers Monitored
143
Pabrik Semarang
NIHL Risk High
12
Needs audiologist
Avg Noise Exposure
88dB
Limit: 85dB/8hr TWA
APD Hearing Comply
91%
Target: 95%
π Audiogram Population Trend
5-Year Average
π Noise Heatmap by Zone
π· NIHL Risk β Worker List
Export CSV β
| Worker | Zone | Avg Noise Exp | Last Audiogram | ΞdB/yr (4kHz) | NIHL Risk | Action |
|---|---|---|---|---|---|---|
BS Budi Santoso | Welding | 92 dB | Mar 2026 | -7.3 dB | CRITICAL | |
AR Ahmad Rizki | Assembly | 88 dB | Mar 2026 | -4.1 dB | HIGH | |
ST Siti Rahayu | Packaging | 78 dB | Mar 2026 | -1.2 dB | WATCH |
Workers (Tambang)
104
Kalimantan Site
Dust Exposure High
6
> 1.5 mg/mΒ³ TWA
Spirometri Abnormal
23
FVC < 80% predicted
Nasal Obstruction
31
VAS score > 5
π« Spirometri Trend β Population
FVC% & FEV1/FVC
π¨ Dust Exposure β Pit Areas
mg/mΒ³ TWA
π Nasal Health Distribution
β οΈ Gas Exposure Today
π€ AI-Generated Insights Today
GaaS PoweredSuryanto (W-019) menunjukkan SpO2 87% di Pit B Level -120m. Pola ini konsisten dengan akut hypoxia akibat akumulasi gas CH4. Berdasarkan trend spirometri 3 tahun (FVC 94%β78%), risiko komplikasi tinggi. Rekomendasikan evakuasi segera + oksigen suplementasi.
Budi Santoso (W-042) mencapai STS OSHA (>10dB shift di 4kHz). Dengan rate decline 7.3dB/tahun dan 6.2 jam/hari di Welding Zone (92dB), proyeksi permanent threshold shift dalam 8 bulan tanpa intervensi. ROI intervensi APD upgrade: 10.7x.
Pit B sector menunjukkan rata-rata FVC decline 8%/tahun dalam 3 tahun terakhir β 2.3x lebih cepat dari Pit A. Korelasi kuat dengan jam ventilasi mekanik yang berkurang 40% sejak retrofit Q3 2024. Rekomendasikan audit ventilasi + rotasi pekerja cross-pit.
π Risk Distribution Today
π° Cost Impact Projection
π Report Generation
Generate AI-powered occupational health reports
π
Monthly MCU Summary
April 2026 Β· All Sites
β
K3 Compliance Report
Kemenaker Format
π€
AI Narrative Report
GaaS Β· Bilingual